From our track record
Laurel Park School
A plant room upgrade and 250 new radiators across the school.
What our team installed
- Plant room upgrade
- 250 new radiators across the school
- Insulation of plant room pipework
Heating
Plant room maintenance, pumps, valves and heating pipework for schools, offices and commercial buildings. Kept running through the heating season.

The best time to find a failing pump or a sticking valve is in the summer, not on the first cold morning of term. We check plant rooms ahead of the heating season and fix what we find, so the building stays warm when it matters.
Our engineers know heating plant from the inside. At Laurel Park School our team upgraded the plant room, insulated the pipework and fitted 250 new radiators.
Work in occupied buildings is planned around term times and opening hours.





From our track record
A plant room upgrade and 250 new radiators across the school.
What our team installed
Late summer is ideal, before the heating goes on for the winter. It leaves time to fix anything we find without the building going cold.
Yes. We plan work so the building stays warm and usable, and we schedule anything disruptive for holidays or out of hours where possible.
Bare heating pipework loses heat into the plant room before it reaches the building. Insulation cuts that wasted energy, keeps surface temperatures safe to touch and protects pipes from condensation.
Yes. We survey the plant room, note the condition of each item and agree a maintenance schedule with you.